Smart City Bhopal is located in the central Indian state Madhya Pradesh. It is amongst India’s greenest cities, popularly nicknamed “The city of lakes”. Bhopal is a city with a strong economic base along with multiple medium and large industries operating throughout. Apart from this, Bhopal is considered one of the financially sound cities and is counted among the two strong wealth pillars of Madhya Pradesh. Housing around 2.5 lakh people, Bhopal has achieved a top spot in the most recent assessment of 2022 by the Union Ministry of Housing and Concrete Affairs. Let’s walk down the lanes of this city to learn more about the Smart City Project Bhopal in depth.
Table of contents
Bhopal Smart City
Under Prime Minister Narendra Modi’s flagship SCM (Smart Cities Mission), Bhopal was chosen as one of the first 20 Indian cities (Phase 1) to be developed as a smart city. For three years in a row—2017, 2018 and 2019—Bhopal was named India’s cleanest state capital city.
Bhopal city has integrated a SPV (special purpose vehicle). Following which Bhopal Smart City Development Corporation Limited has designed, planned, implemented, and monitored the smart city projects in Bhopal. BSCDCL is a company embodied under the Indian Companies Act 2013, with the same shareholding from MPUDCL (Madhya Pradesh Urban Development Company Limited) on behalf of (BMC) Bhopal Municipal Corporation and Government of Madhya Pradesh (GoMP).
Overview of the Company: To plan, design, develop, execute, manage, maintain, operate, and monitor Smart City development projects for the city of Bhopal in compliance with the Smart City Mission of the government of India and state Government
Vision: Making Bhopal, a city of lakes, tradition, and heritage, a top location for smart, connected, and eco-friendly communities centred on education, research, entrepreneurship, and tourism.
Objective of Bhopal Smart City
The Indian Government’s Smart Cities Mission aims to make cities into thriving, sustainable economic hubs. One of the 20 lighthouse cities chosen in the first round of the competition is Bhopal, and it is intended to develop a replicable model that would serve as a beacon for other cities. Only Bhopal was chosen for its redevelopment model, which offers a wealth of opportunities for investments, the creation of new jobs, and the generation of revenue through land monetization with a strategic focus on transit-oriented development. Of the 20 cities chosen, 19 have made similar retrofitting proposals. With a twist, Bhopal is a lighthouse city.
Key infrastructure components of the Smart City Bhopal:
- Adequate water supply; reliable electrical supply
- Sanitation, including the handling of solid waste
- Effective public transportation and urban mobility
- Strong digitisation and IT connectivity
- Good governance, particularly e-Government and citizen involvement
- Sustainable environment, public safety, especially for women, children, and elderly
Bhopal Smart City Projects
Below we have curated an apt table which comprises Smart City project Bhopal’s list. You can check out this table to know all the project names along with their sectors, tender agencies, project holders, milestones, and estimated costing.
State | City | Project Name | Sector | Impact | Implementing Agency | Project Being Taken Up By | Project Milestones | Estimated Project Cost |
Madhya Pradesh | Bhopal | KOLAR – 24*7 water supply with 10 years OandM; projects comprises 100% consumer metering SCADA and PLC | Water supply | Assured water supply | M/s Tata Projects Ltd. | Others | Project has completed | Rs. 86.2 crore |
Madhya Pradesh | Bhopal | Real time tracking and fuel tracking system for Municipal SWM vehicles | Environment Including Pollution | Reduced dependence on and conservation of energy from conventional sources | M/s Incubate Soft tech | SPV | Project is completed. | Rs. 10 crore |
Madhya Pradesh | Bhopal | Solar City-Upper Lake | Energy | Reliability of power supply | M/s Urja Vikas Nigam Ltd | SPV | Project was completed with 500 KW solar panels. | Rs. 4 crore |
Madhya Pradesh | Bhopal | Installation Biomethanization plant at Bittan Market, Bhopal | Solid Waste Management | Reduced dependence on and conservation of energy from conventional sources | M/s Mailhem Ikos Environment Pvt. Ltd. | SPV | Project is Completed. 280 units are being generated on a daily basis. | Rs. 1.05 crore |
Madhya Pradesh | Bhopal | Heritage Development of Sadar Manzil | Economic Development | Increasing local economy and identity | M/s Rajputana Constructions Pvt Ltd | SPV | First phase of the project was completed and inaugurated on 23rd June, 2018. | Rs. 1.92 crore |
Madhya Pradesh | Bhopal | Intelligent transport system | Urban Transport | Transportation and mobility | M/s Incubate Softech Pvt. Ltd. | SPV | Project has been implemented. ITS has been introduced in buses and at bus stops which would allow the authorities to keep a track of every bus in the city. This system would provide an ease to the passengers providing them with essential information. ITS includes features like AVLS, PIS, MIS etc. | Rs. 7 crore |
Madhya Pradesh | Bhopal | Supply, Design, Installation, Testing and Commissioning of Gas Based Fire Suppression System for Server Room, UPS Room, Control and Command Centre and Data Centre | Safety and Security | Improved safety and security of citizens, particularly vulnerable groups (women, children and elders) | M/s SVS Buildwell Pvt Ltd | SPV | Rs. 1.49 crore | |
Madhya Pradesh | Bhopal | Formation of Smart Park on Smart Road at Y-Junction next to Bharat Mata Mandir under Place Making Project | Area Development | Access to open spaces | M/s Belief Buildcon Private Limited | SPV | The project was completed. | Rs. 9.45 crore |
Madhya Pradesh | Bhopal | Construction of Steel Arch Bridge On Lower Lake Connecting Ginnori Road To Kamlapati Visarjan Ghat | Urban Transport | Transportation and mobility | M/s Rajkamal Builders Infrastructure Pvt. Ltd. | SPV | Work has been completed. | . |
Madhya Pradesh | Bhopal | Decorative Lighting System and External Electrification for Sadar Manzil | Economic Development | Improving local identity and economy | M/s Bhasha Associates | SPV | Work has been completed. | . |
Madhya Pradesh | Bhopal | Lifts for Government Housing Phase 1 – ABD Area | Area Development | Mixed land use and compactness | M/s Omega | SPV | Tenders have been awarded. | Rs. 8.73 crore |
Madhya Pradesh | Bhopal | 33 0.433 kV Substation Works for Government Housing Phase 1 – ABD Area | Energy | Reliability of power supply | M/s Renee Power | SPV | Site clearance work in progress. | Rs. 7.17 crore |
Madhya Pradesh | Bhopal | Construction of Transit Houses Unde Rehabilitation | Housing | Improved living conditions for the urban poor | M/s Belief Buildcon Private Limited | SPV | Project was completed. | Rs. 3.01 crore |
Madhya Pradesh | Bhopal | Development of Bicycle Track Corridor, 5 M wide in Bhopal city from RRL to Misrod | Non Motorised Transport and Walkability | Transportation and mobility | M/s KMGS pvt. Ltd. | SPV | Project is completed and was launched with Public Bike Sharing on 19th June 2017. | Rs. 4.86 crore |
Madhya Pradesh | Bhopal | Rationalization of property tax through GIS mapping | IT Connectivity and Digitalisation | Citizen friendly and cost-effective governance and public services | M/s ADCC Infocad Limt | SPV | All ward surveys have been completed. | Rs. 4.73 crore |
Madhya Pradesh | Bhopal | Design, Development, Implementation, Operation and Maintenance of Smart Parking Solution for on-street, off street and multi-level parking in Bhopal area on PPP model | Urban Transport | Transportation and mobility | M/s Mindtech solutions | City | Project under implementation. 10 major parking spots of the city have been converted to smart parking. 3 Multi-Level Smart Parking have been constructed. | . |
Madhya Pradesh | Bhopal | Tactical urbanism and Place making of Jyoti talkies | Area Development | Boost to local identity and economy | M/s Trishul Construction Company | SPV | The project was completed. | Rs. 7.32 crore |
Madhya Pradesh | Bhopal | Solar City-Residential and govt. Buildings | Energy | Reliability of power supply | M/s Urja Vikas Nigam Ltd | SPV | To advance solar power on residential rooftops, BSDCL has started to provide net metering costs to individual people who are setting up solar rooftops in their houses. 120 KW solar panels positioned at ISBT, 35KW solar panels at Mata mandir Bhopal. | Rs. 1 crore |
Madhya Pradesh | Bhopal | Formation of infrastructure comprising workstations, furniture etc. at Incubation centre and Command, Control Centre for BSCDCL | Social Sectors Health and Education | Boost to local identity and economy | M/s MKM Associates | SPV | The project was completed. | Rs. 7.5 crore |
Madhya Pradesh | Bhopal | SCADA for Water supply management for PAN city | Water Supply | Assured water supply | M/s Technosys Security Systems Pvt Ltd | SPV | Work has been completed. | . |
Madhya Pradesh | Bhopal | Boulevard Street Phase 1 | Urban Transport | Transportation and mobility | M/s Shapers Construction Ltd | SPV | The project was completed. | . |
Madhya Pradesh | Bhopal | Visual Improvement Augumentaion of street colony by Architecture Redesigning, Place Making | Non Motorised Transport and Walkability | Access to open spaces | 1. M/s Belief Buildcon 2. M/s Rajvilas Pvt Ltd. 3. M/s KMGS Pvt. Ltd | SPV | The following places are being developed under place making project of Smart City Mission: 1. New Market 2 Streets 2. Near Subhash School 3. Alkpuri Park 04, 05 4. Shakti Nagar Park 5. Priyadarshani Colony Park 6. Rishi Nagar Park 7. Shikshak Congress and also various junction development and Signages. | Rs. 10 crore |
Madhya Pradesh | Bhopal | Choosing consultant to handle the functionalities of Bhopal Living Lab ((BLL) Innovation and Incubation | Digitalisation and IT Connectivity | Boost to local identity and economy | M/s Deloitte Touche Thmatsu India LLP | SPV | Project was completed. | Rs. 5 crore |
Madhya Pradesh | Bhopal | Design, Supply, Installation, Commissioning and testing of indoor modifier substation for ICCC | Energy | Reliability of power supply | M/s Bhasha Associates | SPV | Project was completed and inaugurated on 29/09/2018. | Rs. 4.37 crore |
Madhya Pradesh | Bhopal | Supply and Installation of Modern Underground Waste Collection System by Using Smart Bins of Municipal Solid Waste | Solid Waste Management | Reduced pollution | M/s Zonta Infratech | SPV | This project was completed with a total 120 bins at 70 places in Bhopal Municipal limits. | Rs. 13.55 crore |
Madhya Pradesh | Bhopal | Providing Government Housing on Smart City Mission to BDA – Phase 1A | Housing | Boost to local identity and economy | Bhopal Development Authority | SPV | Work is completed. | . |
Madhya Pradesh | Bhopal | Selection of Implementation Agency for Design, Development, Implementation and Management of Smart Schools in City of Bhopal, Sagar and Satna | IT Connectivity and Digitalizatio | Improved health and education services | M/s Extramarks Education India Pvt Ltd | SPV | Project was completed. | . |
Madhya Pradesh | Bhopal | Restoration and Augmentation of front facade of Buildings near by Sadar Manzil Area under Heritage Walk Project | Economic Development | Boost to local identity and economy | M/s Future Tech Infrastructure | SPV | The project is under implementation. | . |
Madhya Pradesh | Bhopal | Solid Waste Transfer Stations with Equipments | Solid Waste Management | Reduced pollution | M/s Hyva | SPV | Rs. 10.78 crore | |
Madhya Pradesh | Bhopal | Providing Concept Art And Design Work Under Bhopal Smart City | Area Development | Boost to local identity and economy | M/s HNM Studios Designs Pvt Ltd | SPV | Project was completed. | Rs. 0.7 crore |
Madhya Pradesh | Bhopal | Rain Water Harvesting System | Storm Water Drainage | Conservation and reuse of critical resources | M/s Ashwath Infratech Private Limited | SPV | 10 identified places have been completed. | Rs. 8.67 crore |
Madhya Pradesh | Bhopal | Solid Waste Transfer Stations – Civil Work Phase 2 | Solid Waste Management | Reduced pollution | M/s Shree Krishna Infrastructure | SPV | Survey has been started for the mentioned 4 locations as tendered. | Rs. 15.08 crore |
Madhya Pradesh | Bhopal | Upgradation of Transfer Stations | Solid Waste Management | Reduced pollution | M/s Shree Krishna Infrastructure | SPV | Advancement of six transfer stations has been completed along with installation of MRF, Wieghing Bridge, Water Cooler, RFID Tags for garbage vehicles, Guard Room, and Toilets. | Rs. 7 crore |
Madhya Pradesh | Bhopal | Solid Waste Transfer Stations – Mechanical Work Phase 2 | Solid Waste Management | Reduced pollution | M/s Hyva India Pvt. Ltd. | SPV | Work has been completed. | Rs. 13 crore |
Madhya Pradesh | Bhopal | Bhopal plus | IT Connectivity and Digitalisation | Improved safety and security of citizens, particularly vulnerable groups (women, children and elders) | M/s Price Waterhouse Coopers Ltd. | SPV | Fully functional with various citizen services and is being used by citizens of Bhopal. Incorporation with Mayor Express (Local environment) finished. Improvements like ITMS Challan were also incorporated. | Rs. 3.98 crore |
Madhya Pradesh | Bhopal | City Level GIS | IT Connectivity and Digitalisation | Citizen friendly and cost-effective governance and public services | M/s NICSI | SPV | First phase launched on 25th June 2017. | Rs. 2.95 crore |
Madhya Pradesh | Bhopal | Dynamic marketplace | Economic Development | Citizen friendly and cost-effective governance and public services | M/s Pahal Soft Tech | SPV | Project was finished and released on 25th July, 2017. Multiple citizen services like driver, carpenter , plumber, gardener etc, are being included. Incorporation with Bhopal Plus App was done and is completely functional. | Rs. 5 crore |
Madhya Pradesh | Bhopal | Implementation of MEP Services for Incubation centre and Control and Command Centre for BSCDCL | Social Sectors Health and Education | Boost to local identity and economy | M/s MKM Associates | SPV | MEP services for Incubation Center and Control and Command Center have been completed. | Rs. 8.93 crore |
Madhya Pradesh | Bhopal | Development of Gardens and Streets for E-1 Arera Colony | Area Development | Mixed land use and compactness | M/s Garden Paradise | SPV | Work has been completed. | . |
Madhya Pradesh | Bhopal | Extension of Incubation Center 2nd and 3rd Floor for Command and Control Center | Economic Development | Boost to local identity and economy | M/s Shree Krishna Constructions | SPV | Building was completed and inaugurated on 29/09/2018. | Rs. 1.86 crore |
Madhya Pradesh | Bhopal | Design, Supply, Installation, Testing and Commissioning of Decorative Lighting System for Bhopal Lake Beautification | Energy | Boost to local identity and economy | M/s Bhasha Associates | SPV | 200 nos of poles have been installed with EB cable, fibre cable. The project was completed in all aspects. | Rs. 9.07 crore |
Madhya Pradesh | Bhopal | Design, Engineering, Supply and Installation of Interiors for Control and Command Center of Smart Pole Project | IT Connectivity and Digitalisation | Boost to local identity and economy | M/s Pyrotech Workspace Solutions Pvt Ltd | SPV | Interior works for the Control and Command centre for Smart Pole and Intelligent Street Light Project was completed. | Rs. 2.92 crore |
Madhya Pradesh | Bhopal | Commercial Complex Signature Tower | Economic Development | Boost to local identity and economy | M/s SRS Infra Projects Pvt Ltd | SPV | Work has been completed. | . |
Madhya Pradesh | Bhopal | Haat Bazar – ABD Area | Economic Development | Mixed land use and compactness | M/s Bhasha Associates | SPV | Site has been cleared. Raft work is in progress. | . |
Madhya Pradesh | Bhopal | Interior work of existing classrooms at various schools under Smart Education Project | Social Sectors Health and Education | Improved health and education services | M/s MKM Associates | SPV | Civil work for all schools has been completed. | Rs. 9.8 crore |
Madhya Pradesh | Bhopal | Participation in ABD Project of Bhopal Smart City for Undertaking Specified Development Activities on Demarcated Land through Proposed Investment Models | Area Development | Mixed land use and compactness | SPV | SPV | Project was Completed. | Rs. 3000 crore |
Madhya Pradesh | Bhopal | Miscellaneous Civil Works in BMC Limits | Area Development | Access to open spaces | M/s Infrastructure | SPV | Work has been completed. | . |
Madhya Pradesh | Bhopal | Face Lifting Augmentation of Buildings, Place Making Works, Interiors at Various Places in BMC Limits | Area Development | Access to open spaces | M/s MKM Associates | SPV | Work has been completed. | . |
Madhya Pradesh | Bhopal | Green master plan for Bhopal | Environment Including Pollution | Preservation of ecosystems and open spaces | M/s KPMG | SPV | Concept Plan has been submitted. | . |
Madhya Pradesh | Bhopal | Solar City at BMC office | Energy | Reliability of power supply | M/s SECI | SPV | Establishment of 35 KW of rooftop solar was finished at the Honorable commissioner Bhopal Municipal Corporations’ office. List of multiple Bhopal Municipal Corporation’s buildings for advancement of 1 MW rooftop solar was sent to SECI. | Rs. 5 crore |
Madhya Pradesh | Bhopal | Integrated Control and Command center | IT Connectivity and Digitalisation | Citizen friendly and cost-effective governance and public services | M/s Hewlett Packard Enterprise | SPV | Integrated Command and Control Center construction work including server installation, HVAC, Electrification work has been completed. ICCC has been inaugurated on 8th May, 2018. | Rs. 299 crore |
Madhya Pradesh | Bhopal | Government Housing Phase 1 -ABD Area | Housing | Citizen friendly and cost-effective governance and public services | M/s Yashnanda Engineer and Constructions | SPV | work has been completed. | . |
Madhya Pradesh | Bhopal | Solid Waste Transfer Stations – Civil Work | Solid Waste Management | Reduced pollution | M/s Supreme Buildcon & M/s Bhasha Associates | SPV | Rs. 14 crore | |
Madhya Pradesh | Bhopal | HVAC work of total 410 HP at Incubation Centre and Control and Command Building | Economic Development | Boost to local identity and economy | M/s Air Concept | SPV | HVAC work has been completed for all the floors. | Rs. 2.54 crore |
Madhya Pradesh | Bhopal | Operation with Comprehensive Maintenance of 05 nos. Road Sweeping Machines and Dry Wet Cleaning of ROW of Main Roads of Entire Bhopal City | Environment Including Pollution | Reduced pollution | M/s P Gopinatha Reddy | SPV | This project was completed with 3 sweeping machines on the road and 1 machine in spare. 2 water jetting machines. | Rs. 10 crore |
Madhya Pradesh | Bhopal | Miscellaneous Electrical Work Like Existing Line Shifting, Laying of LT Service Lines at Various Locations in BMC Area Limits | Energy | Reliability of power supply | M/s DA & Associates | SPV | The project was completed. | Rs. 0.47 crore |
Madhya Pradesh | Bhopal | Unique Smart Addressing Solution for Urban Properties (USASUP) | IT Connectivity and Digitalisation | Citizen friendly and cost-effective governance and public services | M/s Zippr | SPV | . | |
Madhya Pradesh | Bhopal | Intelligent street pole | Energy | Citizen friendly and cost-effective governance and public services | M/s Bharti Infratel Limited | SPV | 20000 LEDs have been replaced with old lights. 150 Smart poles has been installed in first phase. OFC approx 170 Km has been laid. The Control and Command Centre was inaugurated on 8th May, 2018. | . |
Madhya Pradesh | Bhopal | Smart road from SV Polytechnic College to Bharat Mata square | Urban Transport | Transportation and mobility | M/s Shivshakti Constructions Pvt. Ltd. | SPV | The project was completed. | . |
Madhya Pradesh | Bhopal | Smart public bike sharing | Non Motorised Transport and Walkability | Transportation and mobility | M/s Chartered Bike | SPV | 94 stations installed 480 cycles in operation and currently 30000+ users are registered. | Rs. 6.97 crore |
Madhya Pradesh | Bhopal | Heritage Development of Sadar Manzil – Phase 2 | Area Development | Access to open spaces | M/s Rajputana Constructions Pvt Ltd | SPV | Final Finishing work has been completed. | Rs. 9.35 crore |
Madhya Pradesh | Bhopal | Incubation centre | Economic Development | Boost to local identity and economy | M/s Shree Krishna Constructions | SPV | Construction of Incubation Center has been completed, including HVAC and electrification work. The Incubation Center has been inaugurated on May 8, 2018. | Rs. 12.86 crore |
Madhya Pradesh | Bhopal | Selection of Implementation Agency for Integrated Traffic Management System ITMS in Bhopal City | Urban Transport | Transportation and mobility | M/s Technosys Security Pvt Ltd | SPV | Project has been implemented and is fully functional. Command and Control Center was inaugurated on May 8, 2018. Bhopal city main square was screened with digital cameras for RLVD, ANPR, Detection of no helmet, Over Speeding, Vehicle Tracking and e-Challan has been live on May 8, 2018. | Rs. 17.84 crore |
Madhya Pradesh | Bhopal | Infrastructure Upgradation and Improvement for Commuter Safety | Social Sectors Health and Education | Citizen friendly and cost-effective governance and public services | M/s Milestone Corporation | SPV | Main roads are screened with multiple warning signages, cat eyes, and bollards. | Rs. 49.6 crore |
Madhya Pradesh | Bhopal | Formation of houses and advancement of infrastructure for specified slum localities in Bhopal M.P, Bhanpur under HFA Scheme | Housing | Improved living conditions for the urban poor | M/s R.N Dobariya | City | The work has been completed. | Rs. 138.82 crore |
Madhya Pradesh | Bhopal | Solid Waste Transfer Stations – Civil Work Phase 3 | Solid Waste Management | Reduced pollution | SPV | Project was finished. | Rs. 13.6 crore | |
Madhya Pradesh | Bhopal | Landscaping of Smart Road | Area Development | Access to open spaces | SPV | Project was completed. | Rs. 0.71 crore | |
Madhya Pradesh | Bhopal | Formation of Chandra Shekhar Azad school following rehabilitation | Social fields, education and health | Improved health and education services | M/s Garden Paradise | SPV | Work has been completed. | Rs. 2.99 crore |
source@ https://smartcities[dot]gov[dot]in
Don’t miss It!
Smart City India | Smart Cities India Mission & Projects |
Smart City Delhi | Delhi Smart Cities Projects & Mission |
Smart City Thane | Thane Smart Cities Projects & Mission |
Smart City Ranchi | Ranchi Smart Cities Projects & Mission |
Smart City Dholera | Dholera Smart Cities Projects & Mission |
Smart City Dehradun | Dehradun Smart Cities Projects & Mission |
Smart City Bangalore | Bangalore Smart Cities Projects & Mission |
Smart City Karnataka | Karnataka Smart Cities Projects & Mission |
Bhopal Smart City Map
source@ https://smartcities[dot]gov[dot]in
By 2022, Bhopal hopes to be the most intelligent town in the world. To that end, it has made considerable changes and found answers to its urban environment. This features cutting-edge internet access made possible by solar-powered LED poles, the Bhopal Plus App to support locals, and a geoportal to facilitate exploration of the city map. Now you can simply understand the symbology with the help of Smart City Bhopal’s map which has the fastest orientation in an urban space.
How to Login to Bhopal smart city portal?
The purpose of the smart city portal is to empower cities through data. It is a common platform where all the data from different sources is available to citizens at the right time. The information on this portal helps resolve complicated urban challenges. Real-time data is growing every day thanks to the use of (Internet of Things) IoT devices and other techniques to “feel” the city, giving cities the possibility to handle these problems in a more intelligent manner. The main purpose of smart city portals is to utilise this perspective via its “DataSmart” cities strategy.
Know the steps to log in to the Smart City Bhopal portal:
- Visit https://auth[dot]mygov[dot]in/user/login?destination=oauth2/authorize
- Now tap on the Login option at the top of the page.
- The above steps will direct you to the login page
- Now enter your email id or mobile number and login with OTP
OR
- Enter mobile number or email id
- Type the password in the text field
- Tap on the login with password option
Bhopal Smart City: Citizen Services
Bhopal will use a central cloud to oversee public utilities and citizen services. Turning into a smart city, Bhopal is now rigorously following all the smart city criteria, from beautification and aesthetics to citizen services and heritage conservation. Bhopal nowadays is overlooking E-health, mayor express, place making-tactical urbanisation, PBS and dedicated cycle track.
Below we have jotted down major citizen services of the Bhopal smart city plan.
Popular online citizen services of Bhopal Smart City (G2C) (B2C):
- BMC services such as water tax payment, easy application of death, birth, and marriage certificate, and property tax payment.
- Bus route planner
- Kabadiwala service
- Call administration
- Vehicle search
- Electricity bill payment
- Mayor express (smart handyman services to reserve electrician or plumber)
- Report lost article
- Towed vehicle search
- Search clinics and hospitals
- Report an incident
- Emergency SOS service
- Outdoor media management
There are nearly 20+ citizen-centric services on Bhopal Plus platform. Apart from this, Bhopal has also planned smart streets along with overall city development.
Wrapping it Up
Smart City Bhopal is a place with lakes, traditions, and heritage. It’s a premier location for smart, connected, eco-friendly communities centred on education, research, entrepreneurship, and tourism. All these advanced techniques of Smart City Bhopal make an evolution towards the internet of things and support effective decision-making based on the available information on citizen-centric services.
FAQ’s about Bhopal Smart City
Q1. Is Bhopal on the smart city list?
Bhopal is on the list of 98 smart cities stated by the government of India for development under the Smart Cities Mission.
Q2. Why is Bhopal called a smart city?
Bhopal Municipal Corporation is to transform the city into a leading destination for connected, eco-friendly, and smart communities which are dedicated to research, education, tourism, and entrepreneurship.
Q3. Is Bhopal a metro city?
Bhopal is not a metro city, but is listed in the smart city list.
Q4. Who is the CEO of Bhopal Smart City Development Corporation?
Aditya SIngh, I.A.S. is the CEO of BSCDCL (Bhopal Smart City Development Corporation).